Pulsant Data Centre - 2 Locations

pulsant cropped

Location: North & South London
Client: Pulsant
Project Managers: CTS
Consultant: CTS & MEIT
Duration: South London 5 months | North London 6 months | Completed 1st August 2013
Value: GBP £7 Million

Scope:

  • Turn-Key D & B project, including some Construction works
  • Design, procurement, installation, testing, balancing & commissioning of Electrical and HVAC / Mechanical systems for approximately  2 x 500 m² Data Centers.
  • All mechanical and electrical infrastructure sized to support 1500W/m2 of IT load within usable IT area.
  • With the exception of the primary supply from the existing main LV switchboard, all other infrastructure such as mechanical DX cooling, UPS systems, switchboards, PDUs etc are dedicated to Data Hall 2 as part of Phase 1 works.
  • provide a resilient N+1 UPS solution with 2N distribution paths throughout).
  • Mechanical DX cooling will be provided to the new data hall and electrical plantrooms to a minimum resilience of N+1 in all areas.
  • With the increase of the load on the existing main incoming LV switchboard, replaced the existing 930kVA standby generator with a 2250kVA prime rated containerised set + dedicated bulk fuel tank with 24hours storage capacity.
  • CCTV
  • Access Control
  • BMS

Rackspace Internet Data Center Phases 1, 2 & 3

rackspace cropped

Location: Slough (Near London) UK
Client: Rackspace
Project Managers: Mace, HazProjects & DLB (USA)
Consultant: Hurley, Palmer & Flatt
Duration: 7 months | Nov 07 to May 08 + Jan 09 to June 09 Phase 2 | Jan 11 to July 11 Phase 3
Value: EUR €10 million  (Phase 1 - €4 million | Phase 2 - €3 million | Phase 3 - €3 million )

Scope:

  • Design, procurement, installation, testing, balancing & commissioning of HVAC / Mechanical systems for approximately  3000 m² Data Center.
  • Cooling load 1500W/m²  
  • Chillers 3 (Ph.1) + 2 (Ph.2) + 2 (Ph.3)  x 1,517 kW air cooled
  • Down flow units 3x39 No. x 114 kW  :  30,000 m³/hr
  • Pumps 3 x 55kW : 71 l/s
  • AHU 3x6,000 m³/hr
  • Sprinkler Fire Protection system
  • Air supply & extract ducts, Fans & Heat recovery ventilation units

Savvis Internet Data Center Phases 1 & 2

savvis cropped

Location: Slough (near London) UK
Client: Savvis
Project Managers: Nova
Consultant: EYP mission critical facilities
Duration: Phase 1 - May 08 to Sept. 08 | Phase 2 - Feb to Aug. 2010
Value: EUR €6 Million (phase 1 - €3.5 Million | phase 2 - €3.5 Million)

Scope:

  • Design, procurement, installation, testing, balancing & commissioning of HVAC / Mechanical systems for approximately  3000 m² Data Center.
  • Cooling load 1500W/m²  
  • Chillers 4 x 1,300 kW air cooled – free issue
  • Down flow units 46 No. x 117 kW  :  28,000 m³/hr
  • Pumps 4 x 55kW : 70 l/s
  • AHU’s 2 x 6,000 m³/hr
  • Air supply & extract ducts, Fans & Heat recovery ventilation units